Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la
  • Kenya’s elevated highway gets a green light from the World Bank
    August 18, 2016
    The World Bank agreed to finance construction of Kenya’s first double deck highway, according to media reports. Construction is set to begin by the end of this year on the toll road to link Jomo Kenyatta International Airport and the Nairobi-Nakuru highway. Peter Mundinia the director-general of the Kenya National Highways Authority, explained that construction of the all-elevated dual carriageway will be in three phases. The first will begin with 6.5km running from the airport to Likoni Road and the
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • RiverLinx consortium inks London’s Silvertown Tunnel deal
    November 27, 2019
    The RiverLinx consortium has reached financial close on the €1.17 billion Silvertown Tunnel project after a three-year procurement process by the client Transport for London.