Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • Ed Zublin to start Kriegsstraße car tunnel work in Karlsruhe
    April 28, 2017
    Construction officially started on a two-lane 1.6km road tunnel in the centre of the German city of Karlsruhe. In December, the Stuttgart-based civil engineering subsidiary Ed Züblin announced that it is leading a consortium with Schleith to build the Kriegsstraße car tunnel in the German city of Karlsruhe. Ed Zublin is now a wholly owned subsidiary of the Austria-based contractor Strabag. The tunnel in Kriegsstraße is the second part of the Kombilösung public transport infrastructure project to reduce the
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne
  • Take a walk on the wild side; a revamp for a famous pedestrian crossing
    September 26, 2019
    One of the world’s most famous road crossings is benefiting from an upgrade, on a key anniversary.
  • India road projects being carried out
    July 26, 2017
    The Indian Government has plans to redevelop road infrastructure links in the north east of the country. Planned spending of US$31.1 billion will be used to improve and upgrade the road network in the area by 2019. Plans have been drawn up by India’s National Highways and Infrastructure Development Corp Ltd (NHIDCL) and by the Public Works Department of states.