Skip to main content

Underground tunnel could replace London’s Hammersmith flyover

An underground tunnel could replace the Hammersmith flyover in London, England. Plans state the structure could be built from the Hogarth roundabout to Earl's Court, replacing the existing flyover. The landmark bridge is poised for an 18-month patch-up costing €70.87 million (£60 million), but in 15-20 years will need replacing. Plans to in effect bury the heavily used flyover, which handles 90,000 vehicles each day, have been reportedly welcomed by many residents.
October 16, 2013 Read time: 1 min
An underground tunnel could replace the Hammersmith flyover in London, England.

Plans state the structure could be built from the Hogarth roundabout to Earl's Court, replacing the existing flyover. The landmark bridge is poised for an 18-month patch-up costing €70.87 million (£60 million), but in 15-20 years will need replacing. Plans to in effect bury the heavily used flyover, which handles 90,000 vehicles each day, have been reportedly welcomed by many residents.

Related Content

  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Underground UK asset searches jump 18%, according to LSBUD
    February 18, 2020
    The number of asset underground searches for UK highways projects rose 18% on the year before, according to a data collection and search provider.
  • Norway's tunnel improvements
    March 2, 2012
    Tougher legislation on tunnel safety means that Norway will have to invest heavily in upgrading underground road links.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp