Skip to main content

Underground tunnel could replace London’s Hammersmith flyover

An underground tunnel could replace the Hammersmith flyover in London, England. Plans state the structure could be built from the Hogarth roundabout to Earl's Court, replacing the existing flyover. The landmark bridge is poised for an 18-month patch-up costing €70.87 million (£60 million), but in 15-20 years will need replacing. Plans to in effect bury the heavily used flyover, which handles 90,000 vehicles each day, have been reportedly welcomed by many residents.
October 16, 2013 Read time: 1 min
An underground tunnel could replace the Hammersmith flyover in London, England.

Plans state the structure could be built from the Hogarth roundabout to Earl's Court, replacing the existing flyover. The landmark bridge is poised for an 18-month patch-up costing €70.87 million (£60 million), but in 15-20 years will need replacing. Plans to in effect bury the heavily used flyover, which handles 90,000 vehicles each day, have been reportedly welcomed by many residents.

Related Content

  • Germany’s crumbling roads costing billions
    April 21, 2025
    Germany’s crumbling roads are costing billions to repair.
  • UK’s Annual Local Authority Road Maintenance – ALARM – survey
    June 16, 2017
    Within years, one in six UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM – survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all UK local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Local authori
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.
  • New German autobahn bridge under constriuction
    May 1, 2015
    Crane manufacturer Manitowoc has supplied six Potain cranes to German contractor Max Bögl. These machines are being used for constructing a new bridge carrying the A3 autobahn, close to Limburg. Working at over 70m high, the cranes tower over the Lahn Valley. The cranes for this project were supplied by Max Bögl’s subsidiary, Max Bögl Transport & Geräte. The three topless Potain MDT 222 cranes were selected for the work as they feature tip heights of up to 76.2m and can operate with a working radius of