Skip to main content

The UK’s Humber Bridge gets protected status

Any refurbishments to the Humber Bridge near the northern English city of Hull will be subject to intense scrutiny after being designated a historic site. The bridge - only 36-years old – was the longest single-span suspension bridge for 16 years until it was surpassed in 1998 with completion of Japan’s Akashi Kaikyō Bridge with a main span of 1.9km. The Humber Bridge now ranks eighth-longest as measured by its main span of 1.4km. Historic England, the listed structures designating authority, described the
July 28, 2017 Read time: 2 mins
No alterations, please. We’re protected (photo courtesy Humber Bridge Board)

Any refurbishments to the Humber Bridge near the northern English city of Hull will be subject to intense scrutiny after being designated a historic site.

The bridge - only 36-years old – was the longest single-span suspension bridge for 16 years until it was surpassed in 1998 with completion of Japan’s Akashi Kaikyō Bridge with a main span of 1.9km. The Humber Bridge now ranks eighth-longest as measured by its main span of 1.4km.

Historic England, the listed structures designating authority, described the bridge as a "formidable engineering feat" which "despite its great size and strength has a simple elegance in harmony with the landscape".

The 1.4km bridge is one of nine places being listed in a celebration of Hull's heritage.

It was the longest single-span suspension bridge for 16 years and remains in the top 10 longest spans in the world.

Historic England described it as a "formidable engineering feat", which "despite its great size and strength has a simple elegance in harmony with the landscape".

The bridge now has Grade 1 listed status meaning it is of “special architectural or historic interest”. A listed building or other structure such as a bridge may not be demolished or altered without special permission from local government which often consults a central government agency. Alterations, when permitted, and repairs often must be done with specific materials or techniques to maintain the structure’s original appearance.

Although most structures appearing on the protected lists are buildings, other structures such as bridges, monuments, sculptures, war memorials and even milestones and mileposts are included.

The Humber Bridge joins other bridges on the protected list, including Scotland’s cantilever Forth Rail Bridge near Edinburgh. The bridge, which opened in 1890, is also a 1384 UNESCO Heritage Site.

Among other listed structures is the pedestrian crossing on London’s Abbey Road – iconic because of its appearance on the cover of the Beatles 1969 album of the same name. The album was so named because it was made in Abbey Road studios.

(European bridge update in the forthcoming July/August issue of 3260 World Highways)

For more information on companies in this article

Related Content

  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Penang’s PAN 1 project to go ahead amid environmental concerns
    April 17, 2019
    Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.