Skip to main content

UK’s controversial Stonehenge Bypass tunnel to go ahead

The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
By MJ Woof February 21, 2024 Read time: 2 mins
The UK's highly controversial Stonehenge Bypass Tunnel now looks likely to go ahead – image courtesy of © Albo|Dreamstime.com


Construction work for the controversial Stonehenge Bypass Tunnel project in the UK now looks likely to go ahead. A legal claim by the Save Stonehenge World Heritage Site (SSWSH) was dismissed in the UK’s High Court. This is the latest, and probably the last, attempt by the SSWSH to try and stop the Stonehenge Bypass project.

The SSWSH group claims that diverting the A303 away from the historic site through a bypass that would present environmental and archaeological issues for the 4,000 year old historic monument and the area surrounding it. The project was previously halted in 2021 following blocking moves in the High Court but was then reapproved in mid-2023 by the Department for Transport (DfT). The SSWSH took the case to court again in late 2023, with this now having been dismissed.

The tunnel will be built in a partnership between the Spanish firm FCC, Italian firm WeBuild and Germany company BeMo Tunnelling. The new tunnel will reach a depth of 40m and will be around 200m from the famous Stonehenge archaeological site. 

The project will cost £1.25 billion (€1.41 billion) and will see the construction of a 3.3km dual tube tunnel and connecting roads near the site of the historic monument. The 150km A303 is an important route for Southern England and the stretch past Stonehenge only has a single lane in either direction, resulting in frequent traffic jams. The route carries heavy holiday traffic in summer as well as a high percentage of heavy trucks all year round. Improving the A303 at this stretch will cut congestion and prevent the traffic delays that occur frequently on the route at this point. The new bypass will also improve safety for drivers and local residents alike.

Building the tunnel will be complex. The geology of the area features poor quality rock as well as a high water table. The tunnel will need extensive support measures as well as waterproofing while separation methods will be required to ensure no contaminants reach the local water courses.
 

For more information on companies in this article

Related Content

  • English road works planned
    June 9, 2022
    Major English road works are being planned.
  • UK Government announcing new road widening programme
    November 11, 2014
    The UK Government looks set to announce a major programme of road widening and improvement work. In all some €19.1 billion (£15 billion) is planned to be invested in around 100 large road projects. One of the key projects planned is for a new tunnel on the A303, close to the famous Stonehenge site. The tunnel will measure up to 2.9km long and will carry four lanes of traffic past the Stonehenge site. This tunnel has been proposed and cancelled on a number of previous occasions and has long been recognised a
  • UK announces details of major road building programme
    December 1, 2014
    Details of a major programme of road building projects have been unveiled by the UK Government. The plan envisages some €18.83 billion (£15 billion) being spent on constructing new road links and upgrading existing routes. This is the largest single programme of works for the UK’s road network for several decades. The plan includes 100 major projects, perhaps the most notable being the long-awaited tunnel for the A303 past the Stonehenge archeological site. The existing route is narrow at this point and suf
  • Mumbai’s coastal road project is underway
    April 7, 2021
    Construction work is underway for Mumbai’s complex coastal road project.