Skip to main content

UK’s controversial Stonehenge Bypass tunnel to go ahead

The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
By MJ Woof February 21, 2024 Read time: 2 mins
The UK's highly controversial Stonehenge Bypass Tunnel now looks likely to go ahead – image courtesy of © Albo|Dreamstime.com


Construction work for the controversial Stonehenge Bypass Tunnel project in the UK now looks likely to go ahead. A legal claim by the Save Stonehenge World Heritage Site (SSWSH) was dismissed in the UK’s High Court. This is the latest, and probably the last, attempt by the SSWSH to try and stop the Stonehenge Bypass project.

The SSWSH group claims that diverting the A303 away from the historic site through a bypass that would present environmental and archaeological issues for the 4,000 year old historic monument and the area surrounding it. The project was previously halted in 2021 following blocking moves in the High Court but was then reapproved in mid-2023 by the Department for Transport (DfT). The SSWSH took the case to court again in late 2023, with this now having been dismissed.

The tunnel will be built in a partnership between the Spanish firm FCC, Italian firm WeBuild and Germany company BeMo Tunnelling. The new tunnel will reach a depth of 40m and will be around 200m from the famous Stonehenge archaeological site. 

The project will cost £1.25 billion (€1.41 billion) and will see the construction of a 3.3km dual tube tunnel and connecting roads near the site of the historic monument. The 150km A303 is an important route for Southern England and the stretch past Stonehenge only has a single lane in either direction, resulting in frequent traffic jams. The route carries heavy holiday traffic in summer as well as a high percentage of heavy trucks all year round. Improving the A303 at this stretch will cut congestion and prevent the traffic delays that occur frequently on the route at this point. The new bypass will also improve safety for drivers and local residents alike.

Building the tunnel will be complex. The geology of the area features poor quality rock as well as a high water table. The tunnel will need extensive support measures as well as waterproofing while separation methods will be required to ensure no contaminants reach the local water courses.
 

For more information on companies in this article

Related Content

  • Stonehenge Tunnel project faces further questions
    May 22, 2019
    Plans to construct a tunnel link for the A303 route past the famous Stonehenge monument have hit further problems.
  • Congestion vs. Construction: Controversial UK Tunnel Projects Unveiled
    August 2, 2023

    Join Mike Woof, editor of World Highways, as he delves into three contentious tunnel projects in the UK - the Stonehenge Bypass, the Silvertown Tunnel, and the Lower Thames Crossing. These projects aim to alleviate the long-standing traffic delays at the A303, Blackwall Tunnel, and Dartford Crossing.

  • UK Government finalising plans for Stonehenge road tunnel
    January 12, 2017
    The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
  • Stonehenge tunnel controversy exacerbated by recent incident
    December 7, 2018
    The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.