Skip to main content

UK: Spencer Group wins iconic Humber Bridge repair work

In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.
October 11, 2013 Read time: 1 min
The Humber Bridge pic: Paul Glazzard
In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.

Related Content

  • Amey awarded southwest strategic highways contract in Scotland
    April 6, 2020
    Amey starts in August on the €454 million contract for at least eight years.
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
  • Florida replacing Howard Frankland Bridge
    August 22, 2018
    Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also. The new bridge will carry four lanes of traffi
  • New bridge planned to link Senegal and Mauritania
    July 16, 2018
    A new bridge link is being planned intended to boost transport between Senegal and Mauritania.