Skip to main content

UK: Spencer Group wins iconic Humber Bridge repair work

In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.
October 11, 2013 Read time: 1 min
The Humber Bridge pic: Paul Glazzard
In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.

Related Content

  • JMT and Parsons get a Nice Bridge contract in the US state of Maryland
    July 7, 2015
    In the US state of Maryland, a joint venture of Johnson, Mirmiran & Thompson (JMT) and Parsons Brinckerhoff has won a contract to replace the Harry W. Nice Memorial Bridge. The Maryland Transportation Authority awarded the $1 billion contract to replace the bridge, also known as the Potomac River Bridge and which was opened in 1940. The tolled 2.7km two-lane continuous truss bridge on US 301 spans the Potomac River between Newburg in Maryland and Dahlgren in the state of Virginia. Construction of the
  • Storstrom Bridge to be Denmark’s third longest
    March 8, 2018
    Form and functionality come together in Denmark’s latest Storstrom Bridge design. David Arminas reports. An Italian joint venture recently won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate - Vejdirektoratet - awarded the work to a joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 milli
  • The need to repair and replace the world's bridges
    March 13, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector.
  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.