Skip to main content

UK: Spencer Group wins iconic Humber Bridge repair work

In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.
October 11, 2013 Read time: 1 min
The Humber Bridge pic: Paul Glazzard
In the UK, Hull-based Spencer Group has won a contract to carry out repair work on the iconic Humber Bridge. The €4.5 million (£3.9 million) contract was awarded by the Humber Bridge Board. Spencer will replace four steel 'A-frames' and strengthen other parts of the near Kingston upon Hull, East Yorkshire-based structure. The firm won repair work on the famous bridge in 2009 and 2010.

Related Content

  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • $220 million New Jersey - Pennsylvania bridge upgrade
    May 14, 2025
    Work is underway for a $220 million New Jersey - Pennsylvania bridge upgrade project in the US.