Skip to main content

UK smart motorway work for M4 link

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
September 16, 2019 Read time: 3 mins
The M4 motorway will be widened between London and Reading to boost capacity

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane.

The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five lanes in either direction. This should help reduce delays on the stretch, which are frequent at peak periods and especially at holiday times. A short section of the M4 heading from Slough towards London will also feature five lanes. The rest of the 51km London-Reading stretch will be widened to four lanes in either direction and the four lanes will also extend into London as far as the Junction 3 exit for Hayes and Southall.

The upgrading work commenced 12 months ago and now the project will see the first four bridges over the motorway being demolished.

Many of the bridges along this stretch were built in the 1960s and were designed for the Maidenhead bypass with just two lanes in either direction, prior to being incorporated into the M4 motorway.

These bridges cannot be widened, so they will be demolished in a series of planned works intended to minimise disruption to the 130,000 drivers using the link/day.  

The first phase of the bridge replacement will be carried out between the end of September and mid-November and will see four bridges taken down between the M25 (junction 4b on the M4) and Maidenhead at junction 8/9.  

The four are the Recreation Ground bridge carrying pedestrian and cycle traffic, the Marsh Lane bridge  crossing the M4 to the west of junction 7 near Dorney, the Huntercombe Spur bridge firming part of junction 7 on the M4 and the Monkey Island Lane bridge located west of the River Thames near Dorney.

There will be three weekend closures of the M4 between September and November, which are essential for work to be carried out safely.

The M4 is the main route between London, the west of England and Wales and work to upgrade it to a smart motorway between junctions 3 and 12 started last year. Under the plans, the hard shoulder will be permanently converted into a live running lane between junctions 3 and 12 in both directions. New signs and signals will be used to vary the speed limit to reduce congestion at busy times, and to control traffic if there is an obstruction on the road ahead.  

Related Content

  • Highway widening project for the US
    April 19, 2018
    A highway widening project in the US state of New Hampshire is being assisted by the use of a gravity-fed asphalt paver. The widening work is being carried out as part of an upgrade for a 32km stretch of I-93, which was started eight years ago. The work is being carried out for the New Hampshire Department of Transportation (NHDOT) on a section of the highway between Exits 1 and 5 from the Massachusetts Stateline to Manchester, NH. According to NHDOT, the project involves widening I-93 from two lanes in
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • REBLOC barriers for Rheinbrücke Leverkusen
    July 26, 2024
    Construction of the vehicle restraint system for the new Rheinbrücke A1 Leverkusen (bridge) in Germany was a challenge, according to REBLOC, maker of the system.
  • Urgent repairs to Forth Rd bridge
    March 19, 2012
    Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.