Skip to main content

UK smart motorway work for M4 link

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
September 16, 2019 Read time: 3 mins
The M4 motorway will be widened between London and Reading to boost capacity

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane.

The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five lanes in either direction. This should help reduce delays on the stretch, which are frequent at peak periods and especially at holiday times. A short section of the M4 heading from Slough towards London will also feature five lanes. The rest of the 51km London-Reading stretch will be widened to four lanes in either direction and the four lanes will also extend into London as far as the Junction 3 exit for Hayes and Southall.

The upgrading work commenced 12 months ago and now the project will see the first four bridges over the motorway being demolished.

Many of the bridges along this stretch were built in the 1960s and were designed for the Maidenhead bypass with just two lanes in either direction, prior to being incorporated into the M4 motorway.

These bridges cannot be widened, so they will be demolished in a series of planned works intended to minimise disruption to the 130,000 drivers using the link/day.  

The first phase of the bridge replacement will be carried out between the end of September and mid-November and will see four bridges taken down between the M25 (junction 4b on the M4) and Maidenhead at junction 8/9.  

The four are the Recreation Ground bridge carrying pedestrian and cycle traffic, the Marsh Lane bridge  crossing the M4 to the west of junction 7 near Dorney, the Huntercombe Spur bridge firming part of junction 7 on the M4 and the Monkey Island Lane bridge located west of the River Thames near Dorney.

There will be three weekend closures of the M4 between September and November, which are essential for work to be carried out safely.

The M4 is the main route between London, the west of England and Wales and work to upgrade it to a smart motorway between junctions 3 and 12 started last year. Under the plans, the hard shoulder will be permanently converted into a live running lane between junctions 3 and 12 in both directions. New signs and signals will be used to vary the speed limit to reduce congestion at busy times, and to control traffic if there is an obstruction on the road ahead.  

Related Content

  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • The island of Mauritius is benefiting from new road links
    December 11, 2013
    The island of Mauritius is looking to expand its road links with upgraded highway infrastructure Aseries of road improvements are underway on the scenic island of Mauritius, which lies in the Indian Ocean around 2,000km off the coast of South-east Africa. Called the Road Decongestion programme, this has been set up by the Mauritius Government in a bid to improve transport and safety in this small island nation.
  • Holiday traffic jams
    October 3, 2018
    In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
  • US$346 million Charlotte, NC highway works
    August 16, 2024
    The US$346 million I-485 highway project for Charlotte, NC is underway.