Skip to main content

UK smart motorway work for M4 link

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
September 16, 2019 Read time: 3 mins
The M4 motorway will be widened between London and Reading to boost capacity

Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane.

The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five lanes in either direction. This should help reduce delays on the stretch, which are frequent at peak periods and especially at holiday times. A short section of the M4 heading from Slough towards London will also feature five lanes. The rest of the 51km London-Reading stretch will be widened to four lanes in either direction and the four lanes will also extend into London as far as the Junction 3 exit for Hayes and Southall.

The upgrading work commenced 12 months ago and now the project will see the first four bridges over the motorway being demolished.

Many of the bridges along this stretch were built in the 1960s and were designed for the Maidenhead bypass with just two lanes in either direction, prior to being incorporated into the M4 motorway.

These bridges cannot be widened, so they will be demolished in a series of planned works intended to minimise disruption to the 130,000 drivers using the link/day.  

The first phase of the bridge replacement will be carried out between the end of September and mid-November and will see four bridges taken down between the M25 (junction 4b on the M4) and Maidenhead at junction 8/9.  

The four are the Recreation Ground bridge carrying pedestrian and cycle traffic, the Marsh Lane bridge  crossing the M4 to the west of junction 7 near Dorney, the Huntercombe Spur bridge firming part of junction 7 on the M4 and the Monkey Island Lane bridge located west of the River Thames near Dorney.

There will be three weekend closures of the M4 between September and November, which are essential for work to be carried out safely.

The M4 is the main route between London, the west of England and Wales and work to upgrade it to a smart motorway between junctions 3 and 12 started last year. Under the plans, the hard shoulder will be permanently converted into a live running lane between junctions 3 and 12 in both directions. New signs and signals will be used to vary the speed limit to reduce congestion at busy times, and to control traffic if there is an obstruction on the road ahead.  

Related Content

  • Appointment made for key London Gateway link works
    November 27, 2012
    J. Murphy & Sons Ltd has been appointed by DP World to deliver junction improvement works on the A13/A1014 interchange road - a critical link into the London Gateway site in south east England. The London Gateway project near Stanford-le-Hope in Essex will comprise a deep water container port, Europe’s largest Logistics Park and a new access road linking the park to The Manorway (A1014) at Sorrel’s Roundabout.
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Balfour Beatty begins construction of €23.05mn Merseyside motorway link
    January 31, 2014
    Balfour Beatty this week began construction on a €23.05 million (£19 million) scheme to bypass two congested villages and link communities in Sefton along the west coast of Merseyside in Northwest England directly to the M57 and M58 motorways. The road will be 4.5km long and connect the A565 Southport Road to the motorway junction at Switch Island, avoiding the villages of Thornton and Netherton. The newly designated A5758 Broom’s Cross Road will relieve long-standing traffic issues in the area and provid
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.