Skip to main content

UK report suggests 30km Pennine tunnel with robotic maintenance

The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
December 2, 2015 Read time: 3 mins
The Pennines, coming soon to a tunnel near you

The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England.

An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.

The report also suggested robotic equipment be considered for routine inspections and maintenance tasks, such as tunnel cleaning and waste. “Robotic traffic management will also eliminate the dangers inherent in current systems of traffic management for large-scale maintenance schemes.”
 
Geology of the Pennines is generally suitable for construction of bored tunnels, said the report. “Our preliminary analysis suggests that the cross section through the tunnel will be dual carriageway and we need to have a minimum of two lanes in each direction.” But “the diameter of tunnel bores would be limited to around 15m using present-day tunnel boring machines”.
 
Tunnel design could be effected by the shift from oil-derived combustion to electric, hydrogen and other fuel sources that could reduce the need for ventilation shafts to remove exhaust fumes. The tunnel would need to incorporate low-maintenance systems and products to minimise the frequency of operations and to eliminate unnecessary or hazardous activities.

Even so, it is early days yet for detailed design considerations, according to the Trans-Pennine Tunnel Study Interim Report, published by a Mouchel-Hyder joint venture.
 
In July, 8100 Highways England awarded a €1.85 million contract to Mouchel and Hyder to complete a study for the route which is part of the government’s €21 billion long-term Roads Investment Strategy announced in December last year.

The report is investigating the strategic and economic case for a new high-standard highway route between Manchester and Sheffield, including assessing the potential opportunities of combining with a rail or light rail link. It is anticipated that the new route will cross the Pennines and the Peak District National Park, an extremely environmentally sensitive area.

“We are at too early a stage in the design of the potential scheme to present robust analysis on any of the economic costs and benefits of a scheme,” the report noted. Potential significant benefits include reductions in travel time of up to 30 minutes for both passenger and freight traffic between Manchester and Sheffield.

The current journey between Manchester and Sheffield over Pennine routes is around 72km and takes an average of 85 minutes. The same journey is 120km by the M62 motorway and takes 95 minutes.

Reduced travel over the Pennines could have positive impacts on the environment, according to the study.

“The means by which this new strategic route will be funded have not yet been considered. One option might be to introduce road-user tolls, but this would have an impact on the economic case for the scheme. The effects of tolling will be considered in later stages of the study, although a decision on whether or not to toll the road is outside the scope of the current study.”

Mouchel-Hyder said a final report would be published by October 2016.
 
The interim report is available by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal clicking here Pennine Tunnel false http://www.gov.uk/government/uploads/system/uploads/attachment_data/file/480668/trans-pennine-tunnel-interim-report.pdf false false%>.

For more information on companies in this article

Related Content

  • Beckum-based BEUMER believes its comprehensive conveying competence offers consumer confidence
    February 12, 2013
    BEUMER Group says it will display its comprehensive competence in conveying, loading, palletising and packaging technology along with its customer support. The group, headquartered in Beckum, Germany, will present its “innovative solutions” for bulk materials, such as curved belt conveyors. Both troughed belt conveyors and pipe conveyors are used to transport various bulk materials over large distances and often across impassable terrain.
  • Clip of Unic’s ‘world strongest’ mini crane
    January 6, 2017
    Unic Cranes Europe (UCE) has made a teaser video showcasing what the company claims is the world’s strongest mini crane - set to be unveiled at INTERMAT 2012. The Unic URW-1006 mini spider crane is said to have an unrivalled 10tonnes of lifting power as well as 30.7metres lifting height and 24.3metre working radius. According to UCE, the machine’s 2metre width allows it to retain class-beating minimal dimensions for working in restricted spaces.
  • Clip of Unic’s ‘world strongest’ mini crane
    April 12, 2012
    Unic Cranes Europe (UCE) has made a teaser video showcasing what the company claims is the world’s strongest mini crane - set to be unveiled at INTERMAT 2012. The Unic URW-1006 mini spider crane is said to have an unrivalled 10tonnes of lifting power as well as 30.7metres lifting height and 24.3metre working radius. According to UCE, the machine’s 2metre width allows it to retain class-beating minimal dimensions for working in restricted spaces.
  • High mobility is claimed for CIFA’s concrete plant
    February 7, 2013
    High mobility is claimed for CIFA’s mobile concrete batching plant, the CIFAMOBILE 50. “This is the first ever CIFA concrete batching plant we’ve built. It’s highly mobile and can be transported on wheels,” said Marco Brambati, director of marketing and business planning at the firm. The machine features a mixer that can produce 1/3 of concrete/cycle. This DNA 1.0 mixer is the smallest in the CIFA range (while the largest has a 3m3 capacity) and can deliver up to 50m3/hour of ready-mixed concrete. The plant