Skip to main content

UAE-Saudi Arabia highway connection

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included
February 1, 2018 Read time: 1 min

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included building 15 new interchanges, underpasses, service area, installing LED lighting and improving the drainage facilities.

Related Content

  • Signify to light up Massey Tunnel
    January 15, 2021
    The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.
  • UAE road widening and upgrade project
    June 28, 2019
    A major road widening and upgrade project is to go ahead in the UAE. The project will see the existing Dubai-Al Ain Road being widened and improved along a 17km stretch. At present the section of road features three lanes for traffic. However the US$544.6 million project will see the stretch of road benefiting from three lanes in either direction, doubling capacity from the current 12,000 vehicles/hour. The move is intended to boost safety and reduce delays for drivers. The first phase of the project should
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Road construction in Ghana
    August 23, 2022
    A new generation asphalt plant has proved its worth for the construction of an important road link in Ghana.