Skip to main content

UAE-Saudi Arabia highway connection

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included
February 1, 2018 Read time: 1 min

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included building 15 new interchanges, underpasses, service area, installing LED lighting and improving the drainage facilities.

Related Content

  • Costain completes Cornish construction project
    August 2, 2024
    Costain has completed a key Cornish construction project.
  • Mott MacDonald to design highway improvements in Czech Republic
    August 6, 2015
    Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.
  • West Sussex award for FM Conway
    June 19, 2024
    FM Conway wins West Sussex road maintenance package.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl