Skip to main content

UAE-Saudi Arabia highway connection

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included
February 1, 2018 Read time: 1 min

Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included building 15 new interchanges, underpasses, service area, installing LED lighting and improving the drainage facilities.

Related Content

  • Cambodian connection – construction completion
    May 13, 2022
    Completion of the contract to construct a new Cambodian connection is coming soon.
  • Austria-Slovenia tunnel project awarded
    August 9, 2018
    Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
  • Keeping tunnels safe
    July 20, 2012
    In 2006 Traficon won the first project on the world's first artificial island, the iconic Palm Jumeirah in Dubai, to provide incident detection and traffic data collection along the main arterial road. The technology used included 18 detection units and was won with Siemens Building Technology. The company also won the contract for the tunnel: 26 detection units, in cooperation with Japanese Kinden Corporation. "The Palm Jumeirah vehicular tunnel is in fact the third tunnel (the others are the airport tunne
  • Effective signage and road markings boost road safety
    February 24, 2012
    Effective signage and the use of roadmarkings in the most effective manner can reduce risks for all road users - Mike Woof writes