Skip to main content

UAE highway first section opening to traffic

A new highway section is now open to traffic in the UAE. This highway is designed to connect the north and south of Ras Al Khaimah emirate, extending from the Emirates Road. The new highway features three lanes in either direction, with a maximum speed limit of 140km/h and is designed to carry up to 60,000 vehicles/day. Featuring 10 intersections the Ras Al Khaimah Ring Road will measure 30km-long when complete. Work is being carried out on a number of bridges along the route with the rest of the highway li
July 16, 2018 Read time: 1 min

A new highway section is now open to traffic in the UAE. This highway is designed to connect the north and south of Ras Al Khaimah emirate, extending from the Emirates Road. The new highway features three lanes in either direction, with a maximum speed limit of 140km/h and is designed to carry up to 60,000 vehicles/day. Featuring 10 intersections the Ras Al Khaimah Ring Road will measure 30km-long when complete. Work is being carried out on a number of bridges along the route with the rest of the highway link expected to be ready for traffic in late 2018.

Related Content

  • Construction underway on new Chinese sea crossing
    June 22, 2020
    Construction is now underway on a new Chinese sea crossing.
  • Navteq Traffic Pro expanded in Gulf Region
    April 25, 2012
    Navteq has announced that its real-time traffic service has expanded coverage in the United Arab Emirate cities of Dubai, Abu Dhabi, Sharjah, Ajman, Ummm Al Quwain, Ras Al Khaimah and Fujairah, as well as in the Kingdom of Saudi Arabia - Riyadh, Jeddah, Mecca, Medinah, ad-Dammam.
  • UAE mountain road construction complete
    January 5, 2017
    An eight year project to construct the highest road in the UAE is now complete, with key help having been provided by a fleet of Volvo CE machines The work was carried out by local contractor General Mechanic Company (GMC), with assistance from Volvo CE dealer FAMCO as well as Volvo CE itself and Volvo Trucks. The 36km road climbs 1,910m to its highest point in a mountain range and required the transportation of 5.5 million m3 of materials during its construction.
  • New Macedonia highway section opening
    April 30, 2018
    A new highway stretch measuring 28km long is opening in Macedonia. The work has been carried out by the Greek contractor Aktor. The project has cost €227 million. The new highway section runs from Demir Kapija to Smokvica. Financing has been provided jointly by the European Bank for Reconstruction and Development (EBRD), the European Investment Bank (EIB), a number of funds and also by Macedonia’s own budget. The completion of this section of highway now completes the route connecting the north and south of