Skip to main content

Two Polish road projects moving aheaaad

Work on two sections of the S17 highway in Poland will now go ahead following the granting of permission from the local authorities in the Mazowieckie area. In total the two stretches of the S17 will measure over 25km long. One of the stretches will connect Gonczyce with the ring road around Garwolin and will measure 12.2km. The other stretch runs from Lubelskie through Mazowieckie to Gonczyce and is 13km long. The work is being carried out by the contractor Budimex. Work on a further 95km stretch of the S1
March 9, 2017 Read time: 1 min
Work on two sections of the S17 highway in Poland will now go ahead following the granting of permission from the local authorities in the Mazowieckie area. In total the two stretches of the S17 will measure over 25km long. One of the stretches will connect Gonczyce with the ring road around Garwolin and will measure 12.2km. The other stretch runs from Lubelskie through Mazowieckie to Gonczyce and is 13km long. The work is being carried out by the contractor Budimex. Work on a further 95km stretch of the S17 connecting Warsaw with Lublin is being carried out in seven separate sections. In all this project is costing €744.44 million and is due for completion in 2019.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Poland’s planned programme of highway construction
    December 13, 2013
    Poland’s National Road Construction Programme has been amended for the 2011-15 period. One of the new projects being handled is for the southern section of the ring-road (POW) for capital Warsaw will benefit. The tender process is opening for the construction of an 18.5km section of the S2 dual carriageway from Pulawska junction to Lubelska junction. The General Direction of National Roads and Motorways (GDDKiA) is keen for the southern Warsaw ring road to be open to traffic by 2019. The Pulawska-Lubleska s