Skip to main content

Two new Polish bridges face demolition

Two newly constructed bridges in Poland will now have to be demolished. The bridges are on the A1 highway as it passes Czestochowa, part of the ring road around the southern city. The need for the demolition has been highlighted by tests that show the concrete used in the construction of bridges 361 and 362 to be sub-standard.
August 20, 2018 Read time: 1 min

Two newly constructed bridges in Poland will now have to be demolished. The bridges are on the A1 highway as it passes Czestochowa, part of the ring road around the southern city. The need for the demolition has been highlighted by tests that show the concrete used in the construction of bridges 361 and 362 to be sub-standard.

Related Content

  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Explosive demolition of US421 bridge over Ohio River
    September 23, 2013
    The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Poland to boost high-speed road construction in 2017
    January 24, 2017
    Poland plans to issue a number of major highway construction tenders early this year as part of plan to boost the number of high-speed road projects started in 2017. Around €4.84 billion be spent this year on road construction and maintenance. Expected to be on offer is the missing A1 section between Tuszyn and Czestochowa as well as construction of an S61 dual carriageway from Ostrowia Mazowiecka to Szczuczyn. Polish media reported that around 124km of dual carriageways and motorways were built last