Skip to main content

Turner & Townsend picks up services deal for Stonehenge in the UK

Professional services company Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme. The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England. The
April 6, 2018 Read time: 2 mins
Unhinged around Stonehenge: Cars congested on England’s A303

Professional services company 8731 Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme.
 
The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England.
 
The three-year contract will see Turner & Townsend provide commercial services including estimating, benchmarking performance, commercial reporting and cost management in the period leading up to construction.  The project is undergoing consultation for a preferred route.
 
The consultant has also been appointed to deliver the next phase of two Highways England smart motorway upgrades. Turner &Townsend is providing commercial and programme management for improvements to the M6 between junctions 21a and 26 and M62 between junctions 10 and 12. 
 
Smart motorways increase capacity and reduce congestion by making the hard shoulder available as a traffic lane and by using variable speed limits to smooth traffic flow, supporting economic growth. Work includes an extensive upgrade to the drainage system as well as new emergency areas between junctions. There will be a new ducting system for power and fibre cables and work to overhead signs to provide electronic signs for CCTV and driver information systems.

For more information on companies in this article

Related Content

  • Australia’s Transurban sees boost in traffic and toll revenue
    January 14, 2015
    Transurban, an Australian manager of highways and developer of urban toll roads, saw toll revenue for the December 2014 quarter increase by more than 63% to US$304 million compared to the same period last year. For the half-year ended December 2014, toll revenue rose by 63.7% to nearly $602 million, compared to the corresponding period in 2013, a company statement said. Transurban, established in 1966 and based in Melbourne, owns CityLink in Melbourne, which connects three of the city's major freeways
  • Tampa picks one.network for management
    April 20, 2023
    The Tampa Hillsborough Expressway Authority (THEA) in the US state of Florida is boosting its traffic management, work zone notification and construction planning process.
  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an
  • Highways England launches Maintenance Assistance Vehicle - MAV
    July 7, 2016
    Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by usin