Skip to main content

Turner & Townsend picks up services deal for Stonehenge in the UK

Professional services company Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme. The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England. The
April 6, 2018 Read time: 2 mins
Unhinged around Stonehenge: Cars congested on England’s A303

Professional services company 8731 Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme.
 
The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England.
 
The three-year contract will see Turner & Townsend provide commercial services including estimating, benchmarking performance, commercial reporting and cost management in the period leading up to construction.  The project is undergoing consultation for a preferred route.
 
The consultant has also been appointed to deliver the next phase of two Highways England smart motorway upgrades. Turner &Townsend is providing commercial and programme management for improvements to the M6 between junctions 21a and 26 and M62 between junctions 10 and 12. 
 
Smart motorways increase capacity and reduce congestion by making the hard shoulder available as a traffic lane and by using variable speed limits to smooth traffic flow, supporting economic growth. Work includes an extensive upgrade to the drainage system as well as new emergency areas between junctions. There will be a new ducting system for power and fibre cables and work to overhead signs to provide electronic signs for CCTV and driver information systems.

For more information on companies in this article

Related Content

  • England’s motorways not safe enough for 80mph limit, says RSF
    May 11, 2012
    England’s motorway network is not safe enough to have the speed limit raised to 80mph, according to a new report from the Road Safety Foundation (RSF). Titled ‘Unfit for 80’, the report says poorly-maintained and inadequate roadside protection and the rapidly rising risk of shunt crashes from the sheer volume of traffic using England’s motorways are key factors of safety concern. The RSF document has been published while the Government continues to consider a review of the motorway speed limit. Last autumn,
  • Road paving record set
    July 10, 2020
    Aggregate Industries has set what it believes to be a road paving record.
  • Tarmac’s productivity boost with new software
    August 9, 2018
    A highly sophisticated software system is at the heart of a major boost to productivity and efficiency from contractor Tarmac. The firm is utilising the latest logistics software from Germany to improve its performance. The company is the first contractor in the UK to employ the BPO ASPHALT software developed by Volz Consulting in Germany. This advanced planning and real-time software technology can be utilised to optimise road construction logistics and boost productivity. The software allows Tarmac’s co
  • US$198 million Casablanca road improvement works
    April 22, 2024
    US$198 million of road improvement works are planned in Casablanca, Morocco.