Skip to main content

Turner & Townsend picks up services deal for Stonehenge in the UK

Professional services company Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme. The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England. The
April 6, 2018 Read time: 2 mins
Unhinged around Stonehenge: Cars congested on England’s A303

Professional services company 8731 Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme.
 
The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England.
 
The three-year contract will see Turner & Townsend provide commercial services including estimating, benchmarking performance, commercial reporting and cost management in the period leading up to construction.  The project is undergoing consultation for a preferred route.
 
The consultant has also been appointed to deliver the next phase of two Highways England smart motorway upgrades. Turner &Townsend is providing commercial and programme management for improvements to the M6 between junctions 21a and 26 and M62 between junctions 10 and 12. 
 
Smart motorways increase capacity and reduce congestion by making the hard shoulder available as a traffic lane and by using variable speed limits to smooth traffic flow, supporting economic growth. Work includes an extensive upgrade to the drainage system as well as new emergency areas between junctions. There will be a new ducting system for power and fibre cables and work to overhead signs to provide electronic signs for CCTV and driver information systems.

For more information on companies in this article

Related Content

  • IAM suggests confusion over UK’s SMART motorways
    April 13, 2015
    The Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion exists amongst UK drivers on how best to use SMART motorways. These were officially introduced around this time in 2014 to replace Managed Motorways as the solution to the UK’s congested major routes. However concerns have been raised over the safety of the SMART motorways. England’s first all-lane running motorway, without a hard shoulder, was the 2.5km stretch of the M25 between junctions 23 and 25. Complete schemes
  • UK’s Stonehenge Bypass approved by Government
    July 17, 2023
    The UK’s Stonehenge Bypass project has been approved by the Government.
  • Smart UK motorway scheme
    February 19, 2014
    The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth t
  • UK Highways Agency unveils additional spending plans
    April 12, 2013
    In the UKL the Highways Agency has announced plans for an additional 58 schemes intended to boost the economy, reduce congestion and improve safety. These schemes form part of the third, and final, stage of the Highways Agency’s pinch point programme. The 58 schemes represent an investment of €114.6 million (£98 million) and are intended to remove bottlenecks and keep traffic moving on England’s motorways and major A roads. They will be delivered by March 2015 and will bring an estimated €1.64 billion (£1.4