Skip to main content

Turkish tunnel project on schedule for completion

Work is progressing to plan for the construction of a new tunnel in Turkey. The new Ilgaz Mountain Tunnel should be completed by the end of 2015. This new link will help cut journey times for drivers. The construction of the Ilgaz Mountain Tunnel will reduce the travel distance along the existing route by some 5.4km. Construction work on the tunnel commenced in 2012 and the link will be one of the longest in Turkey when it is complete.
March 5, 2015 Read time: 1 min
Work is progressing to plan for the construction of a new tunnel in Turkey. The new Ilgaz Mountain Tunnel should be completed by the end of 2015. This new link will help cut journey times for drivers. The construction of the Ilgaz Mountain Tunnel will reduce the travel distance along the existing route by some 5.4km. Construction work on the tunnel commenced in 2012 and the link will be one of the longest in Turkey when it is complete.

Related Content

  • A major new tunnel being built in Mexico
    November 13, 2012
    Plans are in hand in Mexico for a new road tunnel that will provide a key link. The 7km tunnel will be constructed at Acapulco port, in Guerrero state. The project is expected to cost in the order of US$214.75 million to complete. Work is due to commence in late January 2013 and should be completed within a two year time scale. The new tunnel will help improve logistics and communications for firm using the port. The project is being carried out by Mexican contractor ICA.
  • Major Australian tunnel contract has been awarded
    October 29, 2021
    A major Australian tunnel contract has been awarded to a consortium.
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.
  • Malaysia tunnel project moving ahead?
    July 11, 2018
    Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel. There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the