Skip to main content

Turkey’s Bosporus bridge opening

Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
August 25, 2016 Read time: 3 mins
Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time.

This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway project. The project was carried out by the IC Ictas – 1324 Astaldi joint venture, which has handled the work under the build-operate-transfer (BOT) model. The consortium will operate the link for 10 years, two months and 20 days (which includes the construction period) before transferring it to Turkey’s Ministry of Transportation. The project team combined Turks from local firm ICTAS and Italians from contractors Astaldi, with designers from Belgium, France and Switzerland and a South Korean sub-contractor.

The bridge is of note as it carries eight highway lanes as well as two railway lines. Its 59m wide deck means that it is one of the largest suspension bridges ever constructed. Although not the world’s longest suspension bridge as such, it is the longest that carries both road and rail connections. The bridge is also of note technically in that it has been designed to cope with the massive earthquake shocks that occur periodically in the area.

The opening of the new bridge will help reduce congestion and journey times on the two existing crossings. It will also help to alleviate the notorious levels of traffic congestion in Istanbul, which often backs up on the feeder routes to the existing bridges.

The bridge has 322m high towers and the project cost some US$3 million. Other sections of the North Marmara Highway are already open to traffic and the entire route should be complete during 2018.

The project to construct the Yavuz Sultan Selim Bridge was the subject of a Key Project Report in World Highways in the %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18017 0 oLinkInternal June 2014 issue Major Europe-Asia bridge connection in Turkey false /sections/key-projects/features/major-europe-asia-bridge-connection-in-turkey/ false false%>.

The first bridge over the Bosporus was completed in 1973 and within one year of its opening, traffic volumes over the structure had grown by around 200% according to research.

The Fatih Sultan Mehmet Bridge (2nd Bridge) opened to traffic in 1988 and since that time, studies show that the volume of vehicles crossing the two bridges has increased enormously by as much as 1,180%. With traffic levels in Istanbul continuing to grow, along with the city’s population, the need for a third crossing has long been recognised and this was initially proposed in the 1990s.

For more information on companies in this article

Related Content

  • Zoomlion looks to expand its operations through organic growth and acquisitions
    January 6, 2017
    Zoomlion is set to grow its operations as Helen Huang, general manager for the firm’s construction hoist machinery branch explained. The firm intends capitalise on its purchase of the tower crane technology from German firm Jost. Huang said, “We have a two year licence with Jost. We purchased the whole set of topless tower crane technology. This is arranged as a two year technology transfer, although there may be the option to extend the period.”
  • Zoomlion looks to expand its operations through organic growth and acquisitions
    April 17, 2012
    Zoomlion is set to grow its operations as Helen Huang, general manager for the firm’s construction hoist machinery branch explained. The firm intends capitalise on its purchase of the tower crane technology from German firm Jost. Huang said, “We have a two year licence with Jost. We purchased the whole set of topless tower crane technology. This is arranged as a two year technology transfer, although there may be the option to extend the period.”
  • HCME’s new customer-led ZW250-5 wheeled loader unveiled at bauma
    January 6, 2017
    Hitachi Construction Machinery (Europe) (HCME) says its new ZW250-5 wheeled loader being unveiled at bauma is the result of feedback from European customers. The model’s cab is said to be more spacious than models from the previous range, because the heated air-suspension seat can slide further back, providing more leg room. The tilting telescopic pop-up steering column has also been repositioned to create additional space. An air conditioning system has been installed that regulates the temperature inside
  • HCME’s new customer-led ZW250-5 wheeled loader unveiled at bauma
    February 8, 2013
    Hitachi Construction Machinery (Europe) (HCME) says its new ZW250-5 wheeled loader being unveiled at bauma is the result of feedback from European customers. The model’s cab is said to be more spacious than models from the previous range, because the heated air-suspension seat can slide further back, providing more leg room. The tilting telescopic pop-up steering column has also been repositioned to create additional space. An air conditioning system has been installed that regulates the temperature inside