Skip to main content

Turkey’s Bosporus bridge opening

Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
August 25, 2016 Read time: 3 mins
Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time.

This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway project. The project was carried out by the IC Ictas – 1324 Astaldi joint venture, which has handled the work under the build-operate-transfer (BOT) model. The consortium will operate the link for 10 years, two months and 20 days (which includes the construction period) before transferring it to Turkey’s Ministry of Transportation. The project team combined Turks from local firm ICTAS and Italians from contractors Astaldi, with designers from Belgium, France and Switzerland and a South Korean sub-contractor.

The bridge is of note as it carries eight highway lanes as well as two railway lines. Its 59m wide deck means that it is one of the largest suspension bridges ever constructed. Although not the world’s longest suspension bridge as such, it is the longest that carries both road and rail connections. The bridge is also of note technically in that it has been designed to cope with the massive earthquake shocks that occur periodically in the area.

The opening of the new bridge will help reduce congestion and journey times on the two existing crossings. It will also help to alleviate the notorious levels of traffic congestion in Istanbul, which often backs up on the feeder routes to the existing bridges.

The bridge has 322m high towers and the project cost some US$3 million. Other sections of the North Marmara Highway are already open to traffic and the entire route should be complete during 2018.

The project to construct the Yavuz Sultan Selim Bridge was the subject of a Key Project Report in World Highways in the %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18017 0 oLinkInternal June 2014 issue Major Europe-Asia bridge connection in Turkey false /sections/key-projects/features/major-europe-asia-bridge-connection-in-turkey/ false false%>.

The first bridge over the Bosporus was completed in 1973 and within one year of its opening, traffic volumes over the structure had grown by around 200% according to research.

The Fatih Sultan Mehmet Bridge (2nd Bridge) opened to traffic in 1988 and since that time, studies show that the volume of vehicles crossing the two bridges has increased enormously by as much as 1,180%. With traffic levels in Istanbul continuing to grow, along with the city’s population, the need for a third crossing has long been recognised and this was initially proposed in the 1990s.

For more information on companies in this article

Related Content

  • IRF Geneva carries out road statistics seminar
    June 28, 2013
    IRF Geneva has carried out a successful webinar on World Road Statistics for Beginners - Techniques and Methods. Participants from all over the world joined in to the key messages and techniques from this webinar. This addressed the core characteristics of raw data brought together in the annual World Road Statistics report, which is one of IRF’s flagship projects. Published since 1964, this publication remains the single comprehensive source of data for the international road, traffic and transport sectors
  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • Belarus opts for a PPP road scheme
    August 12, 2019
    Belarus has started pre-qualification for what will be the country’s first public-private partnership – the M-10 motorway upgrade. David Arminas reports "There’s a little bit of almost everything in this project,” said Steve Gilpin, technical team leader and associate of engineers Ove Arup & Partners International. True to his word, there is. That was how Gilpin kicked off his presentation about Belarus’s planned M-10 motorway project to 180 international bankers, private investors, contractors and en
  • Haulotte sales up 13%
    January 6, 2017
    Haulotte Group (HG) increased its Q4 2011 sales by 13%, compared to the same period of 2010. The rise took consolidated October 1 to December 31 2011 sales to US$107.1million (€82.2 million) compared with $94.5million (€72.5million) in the same three months of last year.