Skip to main content

Tunnel ventilation systems provide fresh air

Elta Fans supplied specialist ventilation fans for the A3 Hindhead Tunnel in Surrey, UK which opened in July this year.
April 11, 2012 Read time: 1 min
Fans from elta provide fresh air into the uK's new Hindhead tunnel
RSS

Elta Fans supplied specialist ventilaton fans for the A3 Hindhead Tunnel in Surrey, UK which opened in July this year.

The A3, which previously ran around the Devil's Punch Bowl, a local beauty spot, now runs right under it in a 2km tunnel built by main contractor 1146 Balfour Beatty.

Ventilation contractor James Paget Services installed two sets of long-cased axial fans from Elta with matching stainless steel ancillaries to ventilate the void in the low-point sump. Each fan works for 12 hours, switches to standby for 12 hours, and then operates in the opposite direction.

The order also included four bifurcated, cylindrically cased ATEX axial fans with matching ancillaries. The bifurcated fans have been developed for handling hostile conditions of hot, dust-laden air, corrosive fumes or gases and are designed so that the gases bypass the motor.

For more information on companies in this article

Related Content

  • Pumping aids tunnel improvement work
    July 28, 2015
    In the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.
  • Asphalt plants looking at greener production systems
    April 10, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports. Lintec, in partnership with Loesche, recently created what they say is the world’s first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal.
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Expandable microsurfacing unit aids road resurfacing
    March 16, 2012
    The VSS Macropaver Expandable Microsurfacing Box is infinitely adjustable between 2.74-4.27m, and is now available.