Skip to main content

Tunnel upgrade project in Pakistan on track

Work on Pakistan’s Lowari Tunnel should be complete by October 2017. Completion of the construction project is dependent on sufficient funding however, according to Pakistan’s National Highway Authority (NHA). The Lowari Tunnel forms part of the Nowshera-Chitral Highway (N-45) and is being upgraded to boost both safety and capacity. So far over 4km of the 8.5km tunnel has been widened, costing close to US$93 million. Once the work is complete, this should reduce the travel time between Chitral and Peshawar
August 28, 2014 Read time: 1 min

Work on Pakistan’s Lowari Tunnel should be complete by October 2017. Completion of the construction project is dependent on sufficient funding however, according to Pakistan’s National Highway Authority (NHA). The Lowari Tunnel forms part of the Nowshera-Chitral Highway (N-45) and is being upgraded to boost both safety and capacity. So far over 4km of the 8.5km tunnel has been widened, costing close to US$93 million. Once the work is complete, this should reduce the travel time between Chitral and Peshawar from the current 14 hours to just seven while also allowing journeys to be made in winter months.

Related Content

  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • Pakistan secures loans for the M4 Khanewal and Shorkot section
    June 16, 2016
    The China-based Asian Infrastructure Investment Bank and the Philippines-based Asian Development Bank will co-finance a 64km highway project between Khanewal and Shorkot towns in Punjab province of Pakistan. A report in Japan Today said that ADB had approved a €88.85 million loan for the project. AIIB will likely get board approval for its nearly €89 million this month. A grant for the project worth nearly €34 million is being extended by the UK’s Department of International Development. The Pakistan