Skip to main content

Tunnel key to reducing freight traffic

According to the Swiss Federal Department of the Environment, Transport, Energy and Communications, the number of freight vehicles travelling by road through the Alps in 2010 increased by 77,000 to 1.257 million, matching the levels of 2007 and 2008.
February 22, 2012 Read time: 1 min
The Swiss want to reduce the number of road freight vehicles travelling through the Alps after the Gotthard Base Tunnel opens in 2019. Seen late last year is the breakthrough in the eastern tube of the twin tube 57km long tunnel. (Pic: Herrenknecht)
According to the 2970 Swiss Federal Department of the Environment, Transport, Energy and Communications, the number of freight vehicles travelling by road through the Alps in 2010 increased by 77,000 to 1.257 million, matching the levels of 2007 and 2008.
The goal by the end of 2011 is to reduce this number to a maximum of 1 million and to 650,000 in 2019 following the opening of the Gotthard Base Tunnel.
According to law if these levels are not achieved the 2972 Swiss Federal Council will have to submit additional measures to achieve it. The Federal Council is to submit alternative proposals later in 2011.
In 2010 more goods were also transported across the Alps by rail, with 62.7% of all freight being transported through the Alps by train, compared to 60.9% in 2009.

Related Content

  • US road safety record
    April 26, 2012
    The latest official statistics from the US on road accidents show that fatality levels on the nation's roads have dropped to the lowest figures seen for more than six decades. The information was released by US Transportation Secretary Ray LaHood, revealing that highway deaths fell to 32,885 for 2010, the lowest level since 1949.
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot
  • I-95 Corridor Coalition vehicle probe project massively expanded
    May 4, 2012
    The I-95 Corridor Coalition, the University of Maryland and Inrix have announced a three-year extension and expansion of the I-95 Coalition Vehicle Probe Project (VPP), operational since 2008, that uses crowd-sourced traffic data and advanced analytics techniques to turn billions of data points into insights that are transforming the manner in which member states build, manage and measure their road networks.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,