Skip to main content

Tunnel driven by TBM

A major tunnel drive has been carried out by a TBM in Italy.
By MJ Woof August 7, 2020 Read time: 2 mins
A TBM built by Herrenknecht has set new records for its tunnel drive in Italy

The largest tunnel boring machine (TBM) ever used successfully in Europe has now completed its drive in Italy. The earth pressure balance (EPB) shield TBM features a diameter of 15.87m and was built by Herrenknecht in Schwanau, Southern Germany.

The TBM bored 7,551m for a new highway tunnel through the Italian Apennines. In cooperation with the customer, Herrenknecht designed a new system for the machine, to protect particularly the site crew from the expected methane gas deposits in the ground.

The machine was configured to the specifications of the customer, Pavimental. Working with the contractor, the Herrenknecht team tailored the TBM to the requirements of the project. A key feature was the warning and protection system to reliably protect the site crew against methane gas deposits predicted underground during the advance.

The large three-lane Santa Lucia tunnel newly excavated by the Herrenknecht EPB Shield is a key section of the new A1 highway route between Bologna and Florence. This will replace the old and winding highway with its dangerous curved. The tunnel will reduce the risk of crashes as well as travel times and the fuel consumption the thousands of vehicles that will use the link each day.

Following 12 months of design and assembly, the EPB Shield was ready at Herrenknecht in Schwanau for acceptance by the contractor and representatives of the client, Autostrade per l’Italia.

After the start of tunnelling in July 2017, the Pavimental miners drove up to 122m of tunnel/week through the Apennine mountain range with the 4,800tonne machine. During the long drive over 7.5km, the EPB machine with its large diameter of 15.87 meters excavated a total of around 1.5 million m3 of soil and rock. The TBM has a shield diameter of 15,870mm, an installed power of 8,750kW and was used in geological conditions featuring limestone, marl, siltstone, shale and sandstone.

With the production of the Santa Lucia machine, Herrenknecht beat the existing European record for TBM diameter of 15.55m. It had been held since 2010 by the Herrenknecht EPB Shield for the Sparvo tunnel, also for the expansion of the A1 motorway in Italy.

For more information on companies in this article

Related Content

  • Efficient recycling with FAE
    June 11, 2020
    FAE has updated its heavyweight, multitask attachment with improvements to the systems that control working depth and water injection
  • Mexico’s new highway for Oaxaca
    May 3, 2023
    Mexico’s Oaxaca State is to benefit from a major new highway link – Mauro Nogarin and Mike Woof report
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • New tunnel contract format published
    May 7, 2019
    The International engineering federation FIDIC (the International Federation of Consulting Engineers) and ITA-AITES (the International Tunnelling and Underground Space Association) are jointly publishing a new form of contract for tunnelling and underground works. Called The Emerald Book, this new contract form is intended to meet developments in the fast-growing underground market sector. The new Conditions of Contract for Underground Works (The Emerald Book) is expected to be widely used. Underground cons