Skip to main content

Tunnel construction for Gdansk, Poland

Work is now underway on the second section of a new tunnel project in the Polish city of Gdansk. The tunnel runs underneath the Martwa Wisla River. The project is of note as it is the first time a TBM has been used to drive a tunnel in Poland. The tunnel will feature twin tubes, each measuring 1.07km long. The tunnel forms part of the Trasa Slowackiego project and is worth some €210 million.
March 10, 2014 Read time: 1 min
Work is now underway on the second section of a new tunnel project in the Polish city of Gdansk. The tunnel runs underneath the Martwa Wisla River. The project is of note as it is the first time a TBM has been used to drive a tunnel in Poland. The tunnel will feature twin tubes, each measuring 1.07km long. The tunnel forms part of the Trasa Slowackiego project and is worth some €210 million.

Related Content

  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Poland’s key road projects
    June 6, 2024
    Major road projects are moving ahead in Poland.
  • Polish tunnel opening to traffic
    July 5, 2023
    The Polish Swina tunnel is opening to traffic.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours