Skip to main content

Tunnel construction for Gdansk, Poland

Work is now underway on the second section of a new tunnel project in the Polish city of Gdansk. The tunnel runs underneath the Martwa Wisla River. The project is of note as it is the first time a TBM has been used to drive a tunnel in Poland. The tunnel will feature twin tubes, each measuring 1.07km long. The tunnel forms part of the Trasa Slowackiego project and is worth some €210 million.
March 10, 2014 Read time: 1 min
Work is now underway on the second section of a new tunnel project in the Polish city of Gdansk. The tunnel runs underneath the Martwa Wisla River. The project is of note as it is the first time a TBM has been used to drive a tunnel in Poland. The tunnel will feature twin tubes, each measuring 1.07km long. The tunnel forms part of the Trasa Slowackiego project and is worth some €210 million.

Related Content

  • Polish tunnel project appeal
    May 18, 2018
    Italian contractor Astaldi will construct the 1.76km-long road tunnel underneath the Swina River in northern Poland.
  • Poland place Via Carpatia on list of priorities
    July 18, 2017
    The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).
  • Austria-Slovenia tunnel project awarded
    August 9, 2018
    Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
  • Building the Pfänder tunnes
    February 10, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.