Skip to main content

Tune in, turn on – in Hungary

Austrian contractor Strabag is to head a consortium carrying out work on an expressway widening project in Hungary worth some €212 million. The project is for the widening and improving of the R 67 expressway that runs from Kaposfüred to Látrány.
June 26, 2017 Read time: 1 min
RSS

Austrian contractor 945 Strabag is to head a consortium carrying out work on an expressway widening project in Hungary worth some €212 million. The project is for the widening and improving of the R 67 expressway that runs from Kaposfüred to Látrány. The consortium’s portion of the work will see a 10.1km section of the existing route being widened and improved while a new 10.3km section will also be built. Strabag holds a 53.2% share of the consortium. The firm working on the remaining 12.6km of the 33km route connecting Kaposfüred and Látrány has yet to be announced.

Drivers using the new R 67 expressway link will benefit from an unusual feature once the work is complete. Those driving at a certain speed will be able to hear the melody to the song Route 67 by Hungarian rock band Republic. This will be achieved due to grooves cut into the road surface generating harmonic frequencies in the tyres of vehicles using the link.

For more information on companies in this article

Related Content

  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
  • Nepal's road safety upgrade
    April 26, 2012
    The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.