Skip to main content

TRL assist Highways Agency with UK motorway hole investigation

TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England. Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is co
February 19, 2014 Read time: 2 mins
777 TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The hole has been filled with pea gravel and the motorway is open, with two lanes running in each direction around the hole. The M2 is expected to fully re-open tomorrow (Thursday) morning.

For more information on companies in this article

Related Content

  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between