Skip to main content

TRL assist Highways Agency with UK motorway hole investigation

TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England. Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is co
February 19, 2014 Read time: 2 mins
777 TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The hole has been filled with pea gravel and the motorway is open, with two lanes running in each direction around the hole. The M2 is expected to fully re-open tomorrow (Thursday) morning.

For more information on companies in this article

Related Content

  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Tensar’s Glasstex makes the grade in UK’s Smart Motorway upgrade
    February 27, 2017
    A Stress Absorbing Membrane Interlayer is delivering stronger, safer and more reliable surfaces for the UK’s M3 Smart Motorways project in the southern England.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b