Skip to main content

TRL assist Highways Agency with UK motorway hole investigation

TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England. Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is co
February 19, 2014 Read time: 2 mins
777 TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The hole has been filled with pea gravel and the motorway is open, with two lanes running in each direction around the hole. The M2 is expected to fully re-open tomorrow (Thursday) morning.

For more information on companies in this article

Related Content

  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • New Argentina highway construction work
    January 11, 2019
    Construction is underway for Argentina’s new Mendoza-San Juan Highway – Mauro Nogarin reports The rehabilitation and maintenance works of more than 3,300km of routes is now underway in Argentina. This followed on after the takeover of six new road corridors under the Public-Private Partnership (PPP) model, which took place in August 2018. The rehabilitation and maintenance works are being carried out prior to the start of the main projects, which will include the construction of highways. Building the
  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.
  • Foiled by foliage from Biotecture
    June 27, 2022
    Richard Sabin, managing director of Biotecture*, details how living walls provide an innovative solution for reducing air pollution and improve air quality along congested urban highways.