Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Brazil’s key projects gathering pace
    January 5, 2021
    Momentum is gathering for two key transport link projects in Brazil.
  • Project building new Biobio bridge in Chile on track
    August 28, 2014
    Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Plans in hand for Uganda’s key highway upgrade
    July 25, 2014
    In Uganda planning is underway for the upgrade of the Kampala-Jinja route. Preparations are being made for a new tolled highway connecting with capital Kampala. The upgrade will see the route being widened with four lanes for much of the length, six lanes on the approach to Kampala and up to eight lanes where vehicle densities will be heaviest to carry the capital’s traffic. The construction work is expected to cost some US$74 million and the new link will connect with the existing Kampala-Entebbe highway.