Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Italy Genoa bridge rebuild
    December 19, 2018
    A design by Italian architect, Renzo Piano, has been selected to replace the Morandi Bridge in Genoa. The new bridge design was submitted to the authorities in Genoa as a proposal in September. Piano is said to be Italy’s most famous living architect and is originally from the city of Genoa himself. The new structure will be built largely from steel and Piano claims that it will be able to last 1,000 years. The new bridge will be built by a consortium comprising the Italian contractors, Salini Impregi
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.