Skip to main content

A thousand birthday greetings for US-Canada Thousand Island Bridge

The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
August 21, 2018 Read time: 2 mins
The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters.


The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montreal and Toronto, ending in Windsor on the Ontario border with the US state of Michigan.

The 1,370m crossing over the American channel of the river - from the US mainland to Wellesley Island - consists of a suspension bridge with a main span of around 245m and nearly 46m of clearance above the river.

The Canadian crossing includes the 183m continuous Warren Truss span connecting Hill Island to Constance Island, a steel arch of 106m spans from Constance Island to Georgina Island and a suspension bridge of 229m from Georgina Island to the Canadian mainland. The Canadian span from abutment to abutment is 1,015m and the suspension span provides 37m of river clearance.

The boundary at the International Rift boundary – the channel between Wellesley Island and Hill Island - is bridged by two parallel 27.4m rigid-frame arched spans of reinforced concrete with masonry facing. Originally there was only one bridge at boundary but due to increased traffic it was twinned in 1959.

Operation of the Thousand Islands Bridge system is shared under a joint agreement that created the US based Thousand Islands Bridge Authority which estimates that there are 2,000 vehicle-cross the annually. The system’s original consulting engineer was Robinson and Steinman of New York City that  continues to do so today but as 3220 Parsons Transportation, notes the authority.

For more information on companies in this article

Related Content

  • Accurate weigh-in-motion technology
    June 21, 2016
    Weigh-in-motion technology is ensuring increasingly accurate, and flexible, weighing stations. Weigh-in-motion specialist manufacturer Axtec says that its space-saving dynamic weighbridge is accurate to within ±0.5% and is the most precise system in the world. From its Runcorn, UK manufacturing facility, Axtec undertakes research and development of new technologies, as well as software testing, fabrication, construction and installation of WIM products. Axtec’s axle weighing platform design is intended f
  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.