Skip to main content

A thousand birthday greetings for US-Canada Thousand Island Bridge

The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
August 21, 2018 Read time: 2 mins
The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters.


The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montreal and Toronto, ending in Windsor on the Ontario border with the US state of Michigan.

The 1,370m crossing over the American channel of the river - from the US mainland to Wellesley Island - consists of a suspension bridge with a main span of around 245m and nearly 46m of clearance above the river.

The Canadian crossing includes the 183m continuous Warren Truss span connecting Hill Island to Constance Island, a steel arch of 106m spans from Constance Island to Georgina Island and a suspension bridge of 229m from Georgina Island to the Canadian mainland. The Canadian span from abutment to abutment is 1,015m and the suspension span provides 37m of river clearance.

The boundary at the International Rift boundary – the channel between Wellesley Island and Hill Island - is bridged by two parallel 27.4m rigid-frame arched spans of reinforced concrete with masonry facing. Originally there was only one bridge at boundary but due to increased traffic it was twinned in 1959.

Operation of the Thousand Islands Bridge system is shared under a joint agreement that created the US based Thousand Islands Bridge Authority which estimates that there are 2,000 vehicle-cross the annually. The system’s original consulting engineer was Robinson and Steinman of New York City that  continues to do so today but as 3220 Parsons Transportation, notes the authority.

For more information on companies in this article

Related Content

  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a
  • Extra funding worth €370 million found for Italian bridge project
    December 8, 2023
    Extra funding worth €370 million is being provided for a key Italian bridge project.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Canadian province taps Vinci for its first public-private partnership
    August 7, 2015
    A Canadian subsidiary of Vinci Concessions, has signed a 30-year public-private partnership (P3) deal for a bypass around the Saskatchewan provincial capital city Regina. Regina Bypass Partners is a (37.5%) subsidiary of Vinci Concessions, in partnership with Parsons Enterprises (25%), Connor Clark & Lunn GVest fund (25%) and Gracorp Capital (12.5%). Parsons Enterprises - the Parsons division focused on the development, delivery, financing, and management of infrastructure under P3s - is an equity par