Skip to main content

Third stage of Sydney’s WestConnex tunnel to be 1km longer

Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state. The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney. The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023.
December 4, 2014 Read time: 2 mins
Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state.

The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney.

The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023. The tunnel will be linked to two other large motorway tunnels that include an M4 extension to Harbefield and M5 East tunnel to St. Peters.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Tony Shepherd, chairman of WestConnex road has said Visit www.dailytelegraph.com.au Website false http://http//www.dailytelegraph.com.au/news/opinion/westconnex-is-a-late-great-leap-forward/story-fni0cwl5-1227022138438?nk=abc01955393b32ecdcef0e0d56cf5672 false false%> that without WestConnex and its supporting works, Sydney roads will grind to a halt by the end of this decade.

“WestConnex is not just a road,” Shepherd wrote in a local Sydney newspaper in August. “It’s Australia’s largest transport project unlocking $20 billion [US$16.8 billion] in economic benefits to NSW, including 10,000 new jobs. As with any great undertaking, it has attracted naysayers trying to safeguard the status quo, an ¬option this great city can’t afford.”

Shepherd wrote that WestConnex is achievable, compared to past proposals, because of “innovative financing ¬relying on a combination of state and federal funding and future private sector ¬investment and tolling”.

Works to build WestConnex will start next year with the $3.3 billion widening and extension of the M4 to four lanes each way from Parramatta to Haberfield, including a tunnel beneath -Parramatta Road.

Related Content

  • VIDEO: Car owner’s manual – chapter one, snake removal
    October 26, 2016
    Snakes can get into the darnedest places, such as your car. The issue then becomes how to get it out. The answer is, with a lot of work and care as well as an equal amount of patience, such as possessed by the man in this video shot somewhere possibly in Southeast Asia Getting a small snake out of a car is tough. Getting a large one out is practically impossible - at least extracting the reptile in one piece and alive is.
  • Boral and Global Ecofuel enter the biofuel and bitumen arena
    May 9, 2019
    An Australian government agency has awarded around US$350,000 to two companies to investigate the production of bitumen and diesel from wood waste. If successful, Australia’s state of New South Wales could become home to the world’s first biorefinery turning sawmill residues into renewable bitumen and diesel, according to ARENA - the Australian Renewable Energy Agency. Under the $842,000 million study, Boral Timber, a major supplier of hardwood and softwood in Australia, will explore the technical and
  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention
  • Consortia line up for Denmark’s Storstrom Bridge project
    February 12, 2015
    Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The new bridge, likely to cost around €565 million including the cost of demolishing the old bridge it will replace, is expected to open by 2021, a