Skip to main content

Third stage of Sydney’s WestConnex tunnel to be 1km longer

Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state. The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney. The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023.
December 4, 2014 Read time: 2 mins
Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state.

The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney.

The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023. The tunnel will be linked to two other large motorway tunnels that include an M4 extension to Harbefield and M5 East tunnel to St. Peters.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Tony Shepherd, chairman of WestConnex road has said Visit www.dailytelegraph.com.au Website false http://http//www.dailytelegraph.com.au/news/opinion/westconnex-is-a-late-great-leap-forward/story-fni0cwl5-1227022138438?nk=abc01955393b32ecdcef0e0d56cf5672 false false%> that without WestConnex and its supporting works, Sydney roads will grind to a halt by the end of this decade.

“WestConnex is not just a road,” Shepherd wrote in a local Sydney newspaper in August. “It’s Australia’s largest transport project unlocking $20 billion [US$16.8 billion] in economic benefits to NSW, including 10,000 new jobs. As with any great undertaking, it has attracted naysayers trying to safeguard the status quo, an ¬option this great city can’t afford.”

Shepherd wrote that WestConnex is achievable, compared to past proposals, because of “innovative financing ¬relying on a combination of state and federal funding and future private sector ¬investment and tolling”.

Works to build WestConnex will start next year with the $3.3 billion widening and extension of the M4 to four lanes each way from Parramatta to Haberfield, including a tunnel beneath -Parramatta Road.

Related Content

  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • Tunnel, M4 motorway widening first stage of WestConnex motorway
    August 23, 2013
    A 4km tunnel and the widening of the M4 motorway will be the first works on the WestConnex motorway project in Sydney, Australia. The initial works will cost between US$2.72 billion (AUD 3 billion) and $3.6 billion (AUD 4 billion). The tunnel will run from Strathfield to Ashfield and will run under the Parramatta Road. The government has pledged $1.62 billion (AUD 1.8 billion) to the project. Announced in October 2012, the completed 33km WestConnex motorway will cover the western, inner western, and sout
  • Partners win highway operation deal in New South Wales, Australia
    January 11, 2016
    Egis Projects and its partner Fulton Hogan Construction have won a major contract for the operation and maintenance of the WestConnex highway link in New South Wales Australia. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu