Skip to main content

Third phase for Colombia’s complex PPP project

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
September 15, 2017 Read time: 1 min

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present. The tunnel sections driven to date include the 4.5km Buenavista II section and the 200m Bijagual II tunnel. Meanwhile three of the bridges should be complete by the end of this year. Coviandina is itself part of the Colombian financial services company Grupo Aval.

Related Content

  • Construction continues for Colombia’s Toyo Tunnel
    May 9, 2018
    Construction work is continuing on Colombia’s Toyo Tunnel project. This is in spite of the controversy regarding one of the firms involved, which has been drawn into the corruption scandal surrounding the Brazilian contractor Odebrecht. The tunnel project is being carried out by a consortium, Consorcio Antioqua al Mar. However the other members of the consortium are in a position to carry on with the project and have all the necessary approvals needed, as well as the necessary equipment. The project is cost
  • New Colombia highway link being built
    February 27, 2018
    A consortium of Colombian construction companies, Concesionaria Desarrollo Vial al Mar (Devimar), is to build the new in Autopista al Mar 1 highway. This 176km link is expected to cost US$790.5 million to build, connecting Medellin with Santa Fe de Antioquia. The new highway will cut journey times on the route by 20-30 minutes, boosting transport for the region. The project is complex and involves the construction of no less than 39 bridges, of which 26 will be situated between the 4.6km Tunel de
  • Lower noise surfaces under spotlight
    July 31, 2012
    Research is paramount in the development of better roads and safety. In a new series, Eurofile looks at the work and programmes of organisations dedicated to that end. In this issue: The German Federal Research Institute (BASt) The aims of BASt (an arm of the Federal Ministry of Transport) are to improve the cost-effectiveness of building and maintaining federal trunk roads, to increase the safety of road transport, to reduce the environmental impact produced by road traffic and construction and to improve
  • New bridges for Belgrade
    February 27, 2012
    Work is now underway in Serbia to build a new bridge over the Danube River.