Skip to main content

Third phase for Colombia’s complex PPP project

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
September 15, 2017 Read time: 1 min

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present. The tunnel sections driven to date include the 4.5km Buenavista II section and the 200m Bijagual II tunnel. Meanwhile three of the bridges should be complete by the end of this year. Coviandina is itself part of the Colombian financial services company Grupo Aval.

Related Content

  • Key Colombian highway under construction
    June 23, 2021
    A key Colombian highway project is now under construction.
  • Colombia’s infrastructure development
    December 2, 2013
    Colombia is benefiting from heavy investment in infrastructure that is helping boost the country’s economy. At the same time, tough policies have also reduced crime considerably and helped stabilise economic development. This process of economic growth and overall stabilisation looks set to continue as the Colombian Government has recently unveiled its plans for highway construction over the next 10 years. This infrastructure programme is also tipped to raise demand for surety products owing to government c
  • Colombia tunnel project ahead of schedule
    June 12, 2020
    Construction work on a key Colombian tunnel project is ahead of schedule.
  • Colombia road tolling contract
    June 20, 2016
    DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo