Skip to main content

Third phase for Colombia’s complex PPP project

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
September 15, 2017 Read time: 1 min

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present. The tunnel sections driven to date include the 4.5km Buenavista II section and the 200m Bijagual II tunnel. Meanwhile three of the bridges should be complete by the end of this year. Coviandina is itself part of the Colombian financial services company Grupo Aval.

Related Content

  • Odinsa’s PPP proposal with Invias for 1,768km of Colombia’s roads
    May 10, 2013
    Colombian construction firm Odinsa is looking to become one of the country's major concession operators. The ambitious company has put forward a new proposal for a public-private partnership for the repair and maintenance of 1,768km of roads that are the responsibility of Invias. The US$409.83 million (COP 750bn) Odinsa proposal seeks to repair 48% of the roads in the next two years, for which the company will use revenue from 20 out of the 35 Invias tolls that it manages. Works would be contracted with thi
  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
  • Slovakian highway projects delayed
    May 13, 2021
    Two Slovakian highway projects are now delayed.
  • Chinese road and bridge projects now commencing
    January 10, 2018
    Major highway and bridge projects are commencing in China. Work is starting on a highway project at Baise city in Guangxi Province as well as on the Malantun section of the Xintai-Tai'erzhuang highway in Shandong Province. The Baise city project is being carried out by the CEEG Gezhouba Group and the deal is worth some US$3.94 billion. The project is being carried out under the PPP model and is for a 35-year concession. The 199km highway will connect Guangxi Province with Yunan Province. Construction is