Skip to main content

Thames Crossing tunnels tendered

The Crossing will almost double road capacity across the Thames River near London.
By David Arminas November 13, 2020 Read time: 2 mins
A new Lower Thames Crossing is being planned

Highways England has invited tenders for the agency’s largest ever contract, the US$2.6 billion (£2 billion; €2.2 billion) deal to build Britain’s longest road tunnel.

The two 4.2km-long twin tunnels and their approaches are part of the proposed Lower Thames Crossing under the River Thames, east of London.
 
The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. Work could start in early 2022, according to Highways England, the UK government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The motorway will have a free-flow charging system where drivers do not to stop but pay remotely, similar to that at the Dartford Crossing. There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2 M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. “The scheme will relieve congestion at the Dartford Crossing by providing a new free flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
The Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure. In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much need relief at Dartford.
 
“From our bidders we’re looking for outstanding construction, health, safety and wellbeing performance,” said Keith Bowers, tunnels and systems director for the Lower Thames Crossing.

“We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers," said Bowers.

Related Content

  • Kapsch secures deal for Westgate Tunnel tolling roadside systems
    June 4, 2019
    Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • The UK Highways Agency engages Fugro for Doppler laser surveying
    January 6, 2015
    The United Kingdom’s Highways Agency has awarded its first commercial contract to survey thousands of road lanes using sophisticated Doppler laser equipment. Fugro is driving the project forward, reports David Arminas The Highways Agency Traffic Speed Defelectometer vehicle looks like an ordinary flatbed truck delivering a similarly ordinary steel shipping container. But looks are deceiving. Inside the container is a sophisticated Doppler laser measuring system collecting pavement condition data of the U
  • The UK Highways Agency engages Fugro for Doppler laser surveying
    January 6, 2015
    The United Kingdom’s Highways Agency has awarded its first commercial contract to survey thousands of road lanes using sophisticated Doppler laser equipment. Fugro is driving the project forward, reports David Arminas The Highways Agency Traffic Speed Defelectometer vehicle looks like an ordinary flatbed truck delivering a similarly ordinary steel shipping container. But looks are deceiving. Inside the container is a sophisticated Doppler laser measuring system collecting pavement condition data of the U