Skip to main content

Thames Crossing tunnels tendered

The Crossing will almost double road capacity across the Thames River near London.
By David Arminas November 13, 2020 Read time: 2 mins
A new Lower Thames Crossing is being planned

Highways England has invited tenders for the agency’s largest ever contract, the US$2.6 billion (£2 billion; €2.2 billion) deal to build Britain’s longest road tunnel.

The two 4.2km-long twin tunnels and their approaches are part of the proposed Lower Thames Crossing under the River Thames, east of London.
 
The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. Work could start in early 2022, according to Highways England, the UK government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The motorway will have a free-flow charging system where drivers do not to stop but pay remotely, similar to that at the Dartford Crossing. There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2 M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. “The scheme will relieve congestion at the Dartford Crossing by providing a new free flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
The Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure. In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much need relief at Dartford.
 
“From our bidders we’re looking for outstanding construction, health, safety and wellbeing performance,” said Keith Bowers, tunnels and systems director for the Lower Thames Crossing.

“We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers," said Bowers.

Related Content

  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Atkins, Jacobs and PwC to advise on RIS3
    December 27, 2022
    The three consultancies will help England’s National Highways agency develop a business plan for its third five-year Road Investment Strategy plan, RIS3.
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.