Skip to main content

Thames Crossing tunnels tendered

The Crossing will almost double road capacity across the Thames River near London.
By David Arminas November 13, 2020 Read time: 2 mins
A new Lower Thames Crossing is being planned

Highways England has invited tenders for the agency’s largest ever contract, the US$2.6 billion (£2 billion; €2.2 billion) deal to build Britain’s longest road tunnel.

The two 4.2km-long twin tunnels and their approaches are part of the proposed Lower Thames Crossing under the River Thames, east of London.
 
The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. Work could start in early 2022, according to Highways England, the UK government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The motorway will have a free-flow charging system where drivers do not to stop but pay remotely, similar to that at the Dartford Crossing. There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2 M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. “The scheme will relieve congestion at the Dartford Crossing by providing a new free flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
The Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure. In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much need relief at Dartford.
 
“From our bidders we’re looking for outstanding construction, health, safety and wellbeing performance,” said Keith Bowers, tunnels and systems director for the Lower Thames Crossing.

“We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers," said Bowers.

Related Content

  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • UV lining is highway drainage first for UK motorway upgrade
    December 19, 2017
    Drainage specialist Lanes Group is implementing the first project to extensively line highway drainage pipes as part of a Smart Motorway initiative in the UK. Lanes has been commissioned by the Carillion Kier Joint Venture working for Highways England to install ultra-violet – UV - liners during the M6 Junction 16-19 Smart Motorway scheme between Crewe and Knutsford, in county Cheshire. Lanes said that it is the first time that roadside drainage pipes will have been extensively lined, instead of being
  • Minister gives green light for UK road schemes
    May 8, 2012
    Roads Minister Mike Penning yesterday gave the green light for development work to be carried out on six new major UK road schemes. The development work, which will take place over the next three years, aims to prime the road schemes for completion in the early years of the next spending review period (post 2015). The six proposed road schemes, which aim to boost economic growth as part of the Government’s National Infrastructure Plan, are:
  • Improving safety for motorcyclists in the UK
    March 14, 2013
    A new safety campaign in the UK is commencing that is focussing on car drivers. These drivers are being urged to visualise the motorcycle rider and take more care at junctions. This campaign has been timed to coincide with the anticipated increase in the numbers of motorcyclists returning to the roads during the second quarter of 2013. This campaign encourages drivers to take longer to look for motorcyclists and think about the biker, not just the bike. Road Safety Minister Stephen Hammond said, “Motorcycli