Skip to main content

Thames Crossing tunnels tendered

The Crossing will almost double road capacity across the Thames River near London.
By David Arminas November 13, 2020 Read time: 2 mins
A new Lower Thames Crossing is being planned

Highways England has invited tenders for the agency’s largest ever contract, the US$2.6 billion (£2 billion; €2.2 billion) deal to build Britain’s longest road tunnel.

The two 4.2km-long twin tunnels and their approaches are part of the proposed Lower Thames Crossing under the River Thames, east of London.
 
The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. Work could start in early 2022, according to Highways England, the UK government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The motorway will have a free-flow charging system where drivers do not to stop but pay remotely, similar to that at the Dartford Crossing. There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2 M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. “The scheme will relieve congestion at the Dartford Crossing by providing a new free flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
The Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure. In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much need relief at Dartford.
 
“From our bidders we’re looking for outstanding construction, health, safety and wellbeing performance,” said Keith Bowers, tunnels and systems director for the Lower Thames Crossing.

“We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers," said Bowers.

Related Content

  • Off road trials for electric highways technology
    August 11, 2015
    Following the completion of the feasibility study commissioned by Highways England into dynamic wireless power transfer technologies, off road trials of the technology needed to power electric and hybrid vehicles on England’s major roads are due to take place later this year. The trials are the first of their kind and will test how the technology would work safely and effectively on the country’s motorways and major A roads, allowing drivers of ultra-low emission vehicles to travel long distances without
  • UK death rate not falling fast enough in The Reported Road Casualties Great Britain Report 2013
    September 26, 2014
    Road safety lobby groups have criticised Britain for pushing down its annual road fatality rate by a further 2% in the past year, the lowest figure since records began in 1926. The Reported Road Casualties Great Britain 2013 (RRCGB) Annual Report, published in September 2014, reveals that 1,713 people were killed in road accidents in the country during 2013, with the number of people seriously injured down by 6% to 21,657 versus 2012.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • The Highways Agency aims to address workzone crashes
    April 10, 2013
    The UK’s Highways Agency is telling drivers to take extra care and to stick speed limits at roadworks, to prevent deaths and injuries among both road users and road workers. Eight road workers have been killed in the last three years while improving and maintaining the strategic road network in England. In addition there are many near misses, with members of the public driving through coned off areas or colliding with works vehicles. The UK Government is investing additional funding in road improvements acr