Skip to main content

Thames Crossing tunnels tendered

The Crossing will almost double road capacity across the Thames River near London.
By David Arminas November 13, 2020 Read time: 2 mins
A new Lower Thames Crossing is being planned

Highways England has invited tenders for the agency’s largest ever contract, the US$2.6 billion (£2 billion; €2.2 billion) deal to build Britain’s longest road tunnel.

The two 4.2km-long twin tunnels and their approaches are part of the proposed Lower Thames Crossing under the River Thames, east of London.
 
The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. Work could start in early 2022, according to Highways England, the UK government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The motorway will have a free-flow charging system where drivers do not to stop but pay remotely, similar to that at the Dartford Crossing. There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2 M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. “The scheme will relieve congestion at the Dartford Crossing by providing a new free flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
The Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure. In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much need relief at Dartford.
 
“From our bidders we’re looking for outstanding construction, health, safety and wellbeing performance,” said Keith Bowers, tunnels and systems director for the Lower Thames Crossing.

“We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers," said Bowers.

Related Content

  • Amey’s hard-hitting safety DVD supports Highways Agency Safety Week
    October 21, 2013
    Amey is playing a leading role in the fight for zero harm at road works sites with the launch of a hard-hitting DVD in support of a national radio advertising campaign to coincide with the UK Highways Agency’s ‘Safety Week’ (October 21-27 October 2013). The public and regulated services provider’s DVD ‘Changing Behaviours – What Does It Take?’ features powerful scenes of near misses and accidents on the motorway and is designed to make employees think about what more they can do to make they keep themsel
  • The radically changing face of UK highways management
    May 14, 2014
    The British Government policy paper ‘Action for Roads: A network for the 21st century’ sets out radical change to the strategic way roads are funded and managed – including plans to turn the Highways Agency into a Government-owned company and a pledge to invest over €33.4 billion (£28 billion) in roads maintenance between 2015 and 2020. Jenny Moten, Highways Agency divisional director for Network Services, gave a keynote presentation on the new approach to strategic highways management during the Road Safet
  • New safer road workzone practices
    September 15, 2014
    In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the Highways Agency. The firm has developed a new method of managing traffic approaching road construc
  • Indra chooses Citilog for Silvertown Tunnel
    June 28, 2024
    Citilog will integrate its automatic incident detection (AID) system to help reduce congestion in and around the tunnel between the London borough of Greenwich, the peninsula area, and West Silvertown.